Commercial hydraulic services

Trade Waste

Trade waste systems installed to meet project requirements and Australian Standards.

Request a Quote
Commercial trade waste floor drains and pipework in an industrial service area

Trade waste plumbing Perth & WA

Trade Waste for Perth & WA project delivery

Our team supports builders and project managers across Perth and WA with trade waste installations that suit the site, usage requirements and compliance expectations of commercial developments.

Our team works with builders, developers, project managers and consultants to coordinate documentation, site conditions and other trades. The result is hydraulic infrastructure that is practical, maintainable and ready for project completion.

Talk to our team

What we deliver

  • Trade waste drainage and collection pipework
  • Grease arrestor and neutraliser installation
  • Kitchen, laboratory and industrial waste connections
  • Sampling points and inspection openings
  • Coordination with water authority requirements

Standards & compliance

  • AS/NZS 3500.2 — Sanitary plumbing and drainage
  • Water Corporation trade waste requirements
  • WA Plumbing Licensing Board requirements

Sectors we serve

  • Commercial Buildings
  • Industrial Facilities
  • Health & Aged Care
  • Education

Trade Waste FAQs

Do you install grease arrestors?

Yes. We install grease arrestors and associated pipework for commercial kitchens and food tenancies, sized and positioned to suit the approved hydraulic design.

Who arranges trade waste approvals in WA?

Trade waste permits are typically arranged between the owner or operator and the water authority. We install the systems to the approved design and can assist with the technical detail needed for the application.

Can you retrofit trade waste systems into existing buildings?

Yes. We assess existing drainage, access and levels, then install trade waste infrastructure with minimal disruption to operating tenancies where required.

What industries need trade waste plumbing?

Commercial kitchens, food and beverage production, laboratories, workshops, medical facilities and industrial processes all typically require compliant trade waste systems before discharge to sewer.

Built around construction project delivery

01

Tender Stage

We review requirements, provide practical advice and prepare accurate tender solutions.

02

Supply & Installation

Quality materials and professional installation by an experienced hydraulic team.

03

Site Coordination

We work with stakeholders and other trades to keep your project on track.

04

Project Completion

Commissioning, testing and handover delivered safely and professionally.

Save time with a more complete quote request.

Share your project type, stage, location and service needs once, so we can understand the scope and get back to you with a more relevant response.

Start Quote Request